Goya España promotes the use of 100% renewable energy
With the aim of powering factory operations with 100% renewable energy, at Goya España we have recently completed the installation of solar energy panels.
These panels are located in the parking area and on the roof of the office area.
They are predicted to produce 480 kwh per year, which is an energy saving of 40%.
In addition to the installation of solar panels, further renovations have been undertaken in the factory, with the installation of odor eliminating blankets, the substitution of the fuel oil boiler for a gas boiler and the subsequent sealing of the fuel oil tanks, thus achieving optimum environmental management.